EN · FR
☰✕
Home › Companies › Manitoba Hydro

Manitoba Hydro

Brandon, MB · Organization as named in National Pollutant Release Inventory (NPRI) – facility data, 2024

Emissions
41

Emissions (41)

DateRecordValueHow this was linked
2024Brandon Generating Station
Fossil-fuel electric power generation · Brandon · MB · NPRI 821
Top substances: Carbon monoxide (50 t), Nitrogen oxides (expressed as nitrogen dioxide) (46.5 t), PM10 - Particulate Matter <= 10 Micrometers (2.2 t)
100.8 tExact normalized name + same province
2024Dorsey Converter Station
Electric bulk power transmission and control · Rosser · MB · NPRI 5354
0 tExact normalized name + same province
2024Radisson Converter Station
Electric bulk power transmission and control · Gillam · MB · NPRI 5355
0 tExact normalized name + same province
2024Henday Converter Station
Electric bulk power transmission and control · Gillam · MB · NPRI 6515
0 tExact normalized name + same province
2024Shamattawa Diesel site
Fossil-fuel electric power generation · Shamattawa · MB · NPRI 17179
Top substances: Nitrogen oxides (expressed as nitrogen dioxide) (113.7 t), Carbon monoxide (30.2 t), PM10 - Particulate Matter <= 10 Micrometers (1.8 t)
147.3 tExact normalized name + same province
2024Brochet
Fossil-fuel electric power generation · Brochet · MB · NPRI 17180
Top substances: Nitrogen oxides (expressed as nitrogen dioxide) (70.5 t), PM10 - Particulate Matter <= 10 Micrometers (1.1 t), PM2.5 - Particulate Matter <= 2.5 Micrometers (1.1 t)
72.6 tExact normalized name + same province
2024Lac Brochet
Fossil-fuel electric power generation · Lac Brochet · MB · NPRI 17181
Top substances: Nitrogen oxides (expressed as nitrogen dioxide) (61.9 t), PM10 - Particulate Matter <= 10 Micrometers (1 t), PM2.5 - Particulate Matter <= 2.5 Micrometers (0.9 t)
63.8 tExact normalized name + same province
2024Tadoule Lake
Fossil-fuel electric power generation · Tadoule Lake · MB · NPRI 17182
Top substances: Nitrogen oxides (expressed as nitrogen dioxide) (42.8 t), PM10 - Particulate Matter <= 10 Micrometers (0.7 t), PM2.5 - Particulate Matter <= 2.5 Micrometers (0.6 t)
44.1 tExact normalized name + same province
2024Kelsey Generating Station
Hydro-electric power generation · Kelsey · MB · NPRI 23002
Top substances: PM10 - Particulate Matter <= 10 Micrometers (3.2 t), PM2.5 - Particulate Matter <= 2.5 Micrometers (0.3 t)
3.5 tExact normalized name + same province
2024Wuskwatim Generating Station
Hydro-electric power generation · Wuskwatim · MB · NPRI 27829
Top substances: Total particulate matter (0 t)
0 tExact normalized name + same province
2024Keewatinohk Converter Station
Electric bulk power transmission and control · Gillam · MB · NPRI 30572
0 tExact normalized name + same province
2024Riel Converter Station
Electric bulk power transmission and control · Dugald · MB · NPRI 30573
0 tExact normalized name + same province
2024Laurie River Generating Station
Electric bulk power transmission and control · Laurie River · MB · NPRI 31253
Top substances: Total particulate matter (0.6 t), PM10 - Particulate Matter <= 10 Micrometers (0.2 t), PM2.5 - Particulate Matter <= 2.5 Micrometers (0 t)
0.8 tExact normalized name + same province
2024Brandon Generating Station
Fossil-Fuel Electric Power Generation · Brandon · MB · NPRI 821
55,642.5 Exact normalized name + same province
2024Natural Gas Distribution System
Natural Gas Distribution · Winnipeg · MB · NPRI 0
41,066.5 Exact normalized name + same province
2023Brandon Generating Station
Fossil-Fuel Electric Power Generation · Brandon · MB · NPRI 821
45,729.9 Exact normalized name + same province
2023Natural Gas Distribution System
Natural Gas Distribution · Winnipeg · MB · NPRI 0
40,826.3 Exact normalized name + same province
2022Brandon Generating Station
Fossil-Fuel Electric Power Generation · Brandon · MB · NPRI 821
19,591.8 Exact normalized name + same province
2022Natural Gas Distribution System
Natural Gas Distribution · Winnipeg · MB · NPRI 0
40,319.5 Exact normalized name + same province
2021Brandon Generating Station
Fossil-Fuel Electric Power Generation · Brandon · MB · NPRI 821
23,880.6 Exact normalized name + same province
2021Natural Gas Distribution System
Natural Gas Distribution · Winnipeg · MB · NPRI 0
39,695.4 Exact normalized name + same province
2020Brandon Generating Station
Fossil-Fuel Electric Power Generation · Brandon · MB · NPRI 821
11,302 Exact normalized name + same province
2020Natural Gas Distribution System
Natural Gas Distribution · Winnipeg · MB · NPRI 0
39,028 Exact normalized name + same province
2019Brandon Generating Station
Fossil-Fuel Electric Power Generation · Brandon · MB · NPRI 821
25,949.6 Exact normalized name + same province
2019Natural Gas Distribution System
Natural Gas Distribution · Winnipeg · MB · NPRI 0
38,616.2 Exact normalized name + same province

Showing the 25 most recent.

Source: National Pollutant Release Inventory (NPRI) – facility data, 2024 — Environment and Climate Change Canada · Licence: Open Government Licence – Canada 2.0 · retrieved 2026-10-18 · Official source ↗
Source: Greenhouse Gas Reporting Program (GHGRP) – emissions by facility, 2004–present — Environment and Climate Change Canada · Licence: Open Government Licence – Canada 2.0 · retrieved 2026-10-18 · Official source ↗

Report a linking error

Is a record attached to the wrong organization? Corrections →

Independent. OpenCanadaData is an independent website. It is not affiliated with, endorsed by, or acting on behalf of the Government of Canada or any government body. Original data is available free of charge from the official sources linked on each page.